Availability: | |
---|---|
Quantity: | |
DongFeng KR
CLW
CLW5180ZY3
Main Technology Parameter | |
Model Name | CLW(DongFeng) sewage suction truck |
Driving Type | 4x2 |
Cabin | DongFeng KR |
Color | White |
Weights | |
Rated payload weight(kg) | 12000 |
Curb weight(kg) | 8250 |
GVW(kg) | 20250 |
Dimensions | |
Wheelbase(mm) | 4500 |
Overall Dimension(mm) | 7780*2500*3400 |
Max speed(km/h) | 90 |
Engine | |
Engine model | ISD180 50 |
Engine type | Four-stroke,Electronically controlled common rail direct injection,Pressurized intercooler |
No. of cylinders | straight-4 cylinders, diesel |
Displacement(L) | 4.5L |
Max. output (kw) | 132kw (180HP) |
Drive Line | |
Transmission | FAST: 8JS85E;8 forwards,2 reverse gear, manual operation |
Steering | Power steering |
Brake | Oil brake with vacuum pump |
Axle | |
Front axle | 5 tons (MAN technology) |
Rear axle | 10 tons (MAN technology) |
Tire specification | |
Tire specification | 10.00R20 ;standard tire,6 tires+1 spare tire |
Sewage suction tank | |
Loading volume | 10m3 |
Box material | 6mm Q235B |
Pump | Weilong double pump 65QZDH-110/7000, Power rate :12KW; Pumping speed: 110L/S; Absolute pressure:7000Pa;Suction depth: 7 meters, |
Other key parts | Power-take-off, hydraulic cylinders, multi-way valve , pressure gauges, water-gas separator , oil-gas separator, level inspection window, suction hose |
Suction operation:
1. Slowly insert the suction pipe into the sewage well or sewage pool. The insertion depth should be appropriate to avoid the pipe mouth being blocked.
2. Start the vacuum pump and control the suction speed by operating the valve. Pay attention to observing the liquid level of the suction tank.
3. During the suction process, always pay attention to the working sound and temperature of the vacuum pump. If there is any abnormality, stop the machine immediately for inspection.
Discharge operation:
1. After arriving at the designated discharge location, stop the vehicle and pull the handbrake.
2. Open the discharge valve and slowly discharge the sewage. Pay attention to controlling the discharge speed and direction.
3. After the discharge is completed, close the discharge valve and clean the discharge pipe.