Availability: | |
---|---|
Quantity: | |
DongFeng KR
CLW
CLW5180SS1
Main Technical Parameters:
Vehicle Description | Brand | CLW |
GVW(kg) | 20250 | |
Curb Weight(kg) | 8250 | |
Overall Dimension(mm) | 7780*2500*3400 | |
Wheelbase(mm) | 4500 | |
Axle Load(kg) | 5000/10000 | |
Top Speed(km/h) | 110 | |
Chassis Brand | DongFeng | |
Chassis Model | DFH1080B80 | |
Cabin | Single,LHD,with A/C | |
Engine | Model | ISL 380 50 |
HP | 380 | |
Emission Standard | Euro 5 | |
Displacement/Output(ml/kw) | 8900/280 | |
Fuel Type | Diesel | |
Rate Speed(rpm) | 2100 | |
Maximum Torque(N·m) | 1700 | |
Maximum Torque Speed(rpm) | 1300-1400 | |
Gearbox | 8Forward/2Reverse Gear | |
Tyre | 265/70R19.5 | |
Tank Description | Tank Material | Q235A |
Sewage Tank Volume(m³) | 11.42 | |
Thickness(mm) | 5 | |
Pump | Germany brand high quality vacuum pump | |
Standard Configuration | 60m high-pressure pipe,10 high-pressure sprayers,inspect window,8m suction pipe,otc. | |
Performance Cofiguration | Suction time ≤5min Effective Suction Range ≥ 9m |
This Dongfeng KR suction sewage truck is built on the dongfeng kr 4x2 chassis and is equipped with 265/70r19.5 tires. The overall vehicle size is 7780×2500×3400mm, and the wheelbase reaches 4500mm. Its power comes from the isl380 50 engine, with a horsepower of up to 380 and a displacement of 8.9L, providing abundant power.
In terms of the upper-mounted part, there is a tank and professional suction sewage devices. The shape size of the sewage tank is (length×diameter) 4900×1800mm, and the tank volume reaches 11.42cbm. The protective material is Q235A carbon steel, which is connected by welding, firm and durable, and can effectively guarantee the stability and safety of the vehicle during the operation process.
Overall, this Dongfeng cleaning and suction sewage truck shows a high level in terms of chassis configuration, power performance and upper-mounted devices, and can meet the needs of various cleaning and suction sewage operations.
Suction operation:
1. Slowly insert the suction pipe into the sewage well or sewage pool. The insertion depth should be appropriate to avoid the pipe mouth being blocked.
2. Start the vacuum pump and control the suction speed by operating the valve. Pay attention to observing the liquid level of the suction tank.
3. During the suction process, always pay attention to the working sound and temperature of the vacuum pump. If there is any abnormality, stop the machine immediately for inspection.
Discharge operation:
1. After arriving at the designated discharge location, stop the vehicle and pull the handbrake.
2. Open the discharge valve and slowly discharge the sewage. Pay attention to controlling the discharge speed and direction.
3. After the discharge is completed, close the discharge valve and clean the discharge pipe.